🌡Combined WIP/Column WIP
Combined WIP/Column WIP
Click “C.WIP” in the “Kanban WIP” toolbar button to view the combined WIP limits in the columns.
Red indicates that the maximum limit has been reached.
Yellow signifies that the minimum limit has not been reached.